Data dive: Datacentre electricity – how much, where, why regions matter
Official figures put datacentre electricity use at 4.46TWh in 2024 – 1.8% of the grid and up 41% since 2020, with the load stacking up in Slough and the M4 corridor
Sources
- T2Data dive: Datacentre electricity – how much, where, why regions matterEurope/UK: Tech.eu / Sifted / TNW / Silicon Republic / UKTN / Computer Weekly / heise / Golem / t3n / Maddyness / FrenchWeb