FERC rejects most of PJM’s large load interconnection plan
The PJM Interconnection’s plan for curtailing large loads that don’t have matching new generation intrudes on state jurisdiction and appears to be discriminatory, the Federal Energy Regulatory Commission said.
Sources
- T2FERC rejects most of PJM’s large load interconnection planUtility Dive / pv magazine / Energy-Storage.news