Engie, LS Power land 2.1 GW in fast-track interconnection approval from PJM
The PJM Interconnection expects Engie’s two storage projects totaling nearly 1.7 GW and LS Power’s 455-MW gas-fired uprate will be online by mid-2029.
Sources
- T2Engie, LS Power land 2.1 GW in fast-track interconnection approval from PJMUtility Dive / pv magazine / Energy-Storage.news